A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.6.1

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Red Oak Community Schools - Red Oak High School Asbestos Abatement

Boyd Jones Construction is the Construction Manager on this project.
Bid Documents for the project are available electronic only in the form of a CD or Download in PDF format.
PLEASE NOTE: The bid date on this project has changed. The new bid date is January 16, 2018.
           Place Order 

 

    

Contact:   Mark Pfister
PreBid Date:   01/04/2018 03:30 PM CST
PreBid Info:  

A Pre-Bid Walk thru is scheduled for January 4, 2018 at 3:30 PM. Contractors attending the pre-bid will meet at the Main Entrance.

Company:   Boyd Jones Construction
Bid Date:   01/16/2018 02:00 PM CST
Bid Info:  

Bids are due on January 16, 2018 at 2:00 PM. The contractor may submit the bid via mail or personal delivery. No electronic or faxed bids will be accepted.
Mailing Address: Red Oak Community School District, 2011 N. 8th Street, Red Oak, IA 51566, Attention: Boyd Jones Construction – Abatement Proposal.
Personal Delivery: Red Oak Community School District Offices – Tech Center Entrance 2011 N. 8th Street Red Oak, IA 51566 Attention: Boyd Jones Construction – Abatement Proposal.

Project Location: Red Oak, Iowa

Public Notes:
The project includes the removal, cleanup and disposal of asbestos-containing materials from the designated sections of the structure. The ACM is in the form of floor tile/floor mastic, Surface materials, wall texture, and caulk.



Job Purchase Information:


CD's and Downloads of the project in PDF format are available at a cost of $15.00 each, PURCHASE ONLY.


If shipping of CD is required, there is a flat rate of $9.00 per CD.


Addenda
  • 01/08/2018 - Addendum #1 Addendum #1 was posted on 1-8-2018  Click to View
  • 01/10/2018 - Addendum #2 Addendum #2 was posted on 1-10-2018  Click to View
  • 01/10/2018 - Addendum #3 Addendum #3 was posted on 1-10-2018  Click to View