A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.6.1

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Red Oak Community School District - High School Addition & Remodel

Boyd Jones Construction is the Construction Manager on this project.
PLEASE NOTE: The bid date on this project has changed. The new bid date is April 17, 2018.
           Place Order 

 

    

Contact:   Janey Mass
PreBid Date:   03/27/2018 10:00 AM CST
PreBid Info:   There will be two pre-bid conferences on this project for all bidders. The will be held at the project location on March 27, 2018 and April 4, 2018 at 10:00 a.m. Prospective bidders are requested to attend.

Company:   Alley Poyner Macchietto Architecture
Bid Date:   04/17/2018 02:00 PM CST
Bid Info:   Owner will receive sealed bids until 2:00 PM on April 17, 2018. Bids should be sent to Red Oak Community School District, 2011 N 8th St., Red Oak, IA 51566. Bids will be thereafter publicly opened and read aloud.

Project Location: Red Oak, Iowa

Public Notes:
Project Description: Project consists of, but is not limited to the following: A complete renovation of the existing 1969 High School Building approx 70,000 SF. Work includes all new MEP including technology, access control, and fire sprinklers, finishes from flooring to ceilings, locker room renovations, restroom renovations, auditorium upgrades, and minor classroom reconfigurations. Additional renovations will occur in the STEAM (Tech) Center building built circa. 2000, including finishing previous white box spaces for science labs, family consumer sciences, graphic arts, and industrial tech. An addition of approximately 30,000 SF will consist of a new gymnasium, student commons, elevator, kitchen and servery. This addition will link together the STEAM Center from 2000 and the High School from 1969.
This Bid Package will be awarded as multiple prime contracts.



Job Purchase Information:
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950, upon depositing the sum of one hundred dollars ($100.00) for each set of Documents. Checks shall be made out to Red Oak Community School District. Builders Cards will also be accepted on this project.

CD's and Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $30.00 payable to A&D Technical Supply Co., Inc.
Only complete sets of Bid Documents may be obtained.

If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $45.00 payable to A&D Technical Supply Co., Inc.
If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.

Bid Documents MUST be returned, in good condition, within 30 calendar days of Bid Opening to obtain a deposit refund.


Addenda
  • 03/22/2018 - Addendum #1 Addendum #1 will be included with the plan set.  Click to View
  • 03/29/2018 - Addendum #2 Addendum #2 was sent via UPS on 3-29-2018  Click to View
  • 04/06/2018 - Addendum #3 Addendum #3 will be send via UPS on 4-9-2018  Click to View
  • 04/12/2018 - Addemdum #4 Addendum #4 will be sent via UPS on 4-12-2018 & 4-13-2018  Click to View