UNMC - Williams Science Hall Renovation (REBID) & Wittson Hall Renovation & Wigton Heritage Center

An additional tour will be held on Wednesday, December 5, 2018 from 1:00 to 2:30 PM.
The tour will start at Williams Science Hall and move to Wittson Hall-Heritage.
All parties interested in joining the tour are to meet in the lobby of Williams Science Hall (Level 1).
Parking will be in Lot #63 which is North of Marcy Street between 39th & 40th Streets.
Attendance at this meeting is not required and DOES NOT fulfill the Mandatory Pre-Bid meeting requirement.
           Place Order 

 

    

Contact:   Nicholas Knopik
PreBid Date:   11/20/2018 09:00 AM CST
PreBid Info:   All Bidders are required to attend and other interested parties are invited to attend a Pre-Bid meeting for distribution of information and tour of Project Site.

1. TIME:
Tuesday, November 20, 2018; 9:00 AM Local Time.

2. PLACE:
University of Nebraska Medical Center
Facilities Management and Planning
4230 Building - Room 2007
Omaha, Nebraska

3. Parking:
Lot 63, Southeast corner of 40th & Marcy.

Company:   UNMC Facilities Mgt.
Bid Date:   12/13/2018 02:00 PM CST
Bid Info:   The Board of Regents of the University of Nebraska invites Bids for for Williams Science Hall Renovation (Project #1) and Wittson Hall Renovation and Wigton Heritage Center (Project #2) at the University of Nebraska Medical Center, Omaha, Nebraska (UNMC). The Williams Science Hall Renovation and Wittson Hall Renovation and Wigton Heritage Center will be bid jointly per the information included in this section. While it is the intent for both projects to be bid together, it is up to the General Contractor to submit bids for one or both projects. Please see Section 00 42 00 – Proposal Form for additional requirements for submitting for individual projects. The University of Nebraska reserves the right to select a single general contractor for both projects, or separate general contractors for each project.BID RECEIVING AND OPENING: Sealed Bid Proposals as follows:

RECEIVING TIME: Thursday, December 13, 2018; 2:00 PM Local Time.
RECEIVING PLACE:
Purchasing Department, by one of following methods:
Hand-Carry Delivery:
Facilities Management and Planning, Room 2019
4230 Leavenworth St.
Omaha, Nebraska
Mailing Address:
Facilities Management and Planning
University of Nebraska Medical Center
987100 Nebraska Medical Center
Omaha, Nebraska 68198-7100
Express Mailing Address:
(UPS, FedEx, Airborne, etc.)
General Supply, University of Nebraska Medical Center, 601 South Saddle Creek Road
Omaha, Nebraska 68105.
Parking:

There will be limited parking stalls located on the north side of the 4230 Building that will be available on a first come – first served basis.
Opening time shall be 10 minutes after receiving time. Bids are valid only if deposited at designated location prior to receiving time. All Bids are registered by automatic time clock at time of deposit. Bids deposited after receiving time will be returned unopened. Valid Bids will be publicly opened and read aloud. All Bidders and interested parties are invited to attend. A Bidder's List of the Bids shall be available for attendees.

Project Location: Omaha, Nebraska

Public Notes:
The Work of Project is defined by the Contract Documents and consists of the following renovation and rehabilitation work at UNMC’s existing Williams Science Hall building: Rehabilitation of the following exterior envelop components: Seal and coat existing EIFS walls, Replace existing glazing with new glazing in existing frames, Replace existing exterior storefront doors and hardware; Renovation of building interior configuration to general science instruction, including: Reconfiguring spaces as shown on the Drawings, Relocating restroom facilities, Renovation of interior finishes, New wood doors and hardware in existing hollow metal frames where indicated on the Drawings; Updating of life safety and security features, including: New guard railing and hand railing at existing stair towers, Access control hardware at select doors indicated on the Drawings, Renovation of shaft walls, fire walls, and other building code updates; Complete renovation of HVAC system as indicated on the Drawings; Renovation of building electrical system and lighting as indicated on the Drawings.

The Work of Project is defined by the Contract Documents consists of the following: a. McGoogan Medical Library (Levels 6, 7 & 8 of Wittson Hall): Complete renovations to interiors and systems supporting Levels 6, 7 & 8 of the McGoogan Medical Library. Modernize Library Space and provide faculty office space; On Level 9 Rooftop, add supply fans above stairwells 8098 D & 8098E to comply with high rise stair pressurization requirements; Replace existing windows, reseal joints in precast concrete, and repair deteriorated precast concrete on Levels 6, 7 & 8 of the McGoogan Medical Library; Remove selected Precast Concrete wall panels and replace with curtainwall.
Wittson Hall Levels 1, 2, 3, 4 & 5: In the Level 1 Mechanical Room add a new wall & doorway separating the existing mechanical room from an existing utility tunnel; On Level 2: Remodel Level 2 Gross Anatomy Locker Rooms supporting and adjacent Comparative Medicine space, Remodel Men’s & Women’s Public Toilet Rooms in compliance with ADA, Remodel and upgrade the ductwork system serving the Gross Anatomy Lab; On Level 3: Demolish space in the Lower Level Amphitheater and remodel to provide a new conference room, toilet shower, bicycle storage and electrical closet, Replace and add hand washing sinks in existing Men’s & Women’s public toilet rooms, Remove existing plumbing, casework and finishes in existing Class Lab 3020, and upgrade to new design, Demolish and upgrade finishes in Corridor 3099A, the adjacent elevator lobby, and Lobby, Remove existing finishes, railings and doors to Stair 3098A through 6098A and replace with new railings, doors and finishers, Upgrade Fire Command 3001 to meet High Rise code requirements; On Level 4: Demolish and upgrade Class Lab 4004, Provide a new entrance corridor to Decontamination Sterilization 4020, Demolish the area approximately between grids L & G and remodel into Gallery Space, Lounge Seating, Public Toilets, and Catering Support Areas, Expand the width of Corridor 4099B and add Storage 4042 and Janitor Closer 4035 by constructing new floor structure above Unfinished 4037 Amphitheater. Upgrade floor, wall and ceiling finishes and lighting in Corridors 4099B & 4099 BA. Upgrade ceiling finishes and lighting in Corridor 3099B which are disturbed by widening corridor 4099B, Remove existing eyewash & emergency shower in corridor 4099B, and add new emergency showers in Labs 4038, 4037, & 4033, Add office space in the Upper Amphitheater area, by constructing new floor slab; On Level 5: Remodel offices on Level 5, the Chancellor’s suite, to accept the Heritage Center expansion, Add supply fans above stairwells 5098 B & 5098C to comply with high rise stair pressurization requirements.
Heritage Center at levels 3-5 and related University Tower 1 work on levels 3, 4, 5, 6 & Rooftop 7: Demolish an existing link between Wittson Hall and University Tower 1. Add a curtain wall enclosed structure between Wittson Hall and University Tower 1 to serve the Chancellor’s mission; University Tower 1 work: Replace existing windows in UT1 with 2 hour rated windows to maintain a fire separation; Add return ductwork chases in offices at the Northeast and South East corners of UT1 which will serve the new Heritage Center space; Add a new mechanical space on the Level 7 roof of UT1 to serve the new Heritage Center space; Add new corridor links from the Heritage Center to UT1 at levels 4 & 5.
Wittson Hall Work: Enclose and expand part of the Level 5 Rooftop area as part of the Heritage Center, serving the Chancellor’s mission. Upgrade the wall separation to 1 hour rating; Remove portions of the west façade of Wittson Hall to connect the Heritage Center with the Level 4 Gallery Remodel.
Site Work: Re-grade and refinish the Plaza area south of the New Heritage Center; Revise site work on the north side of the Heritage Center to tie it into the existing site.



Job Purchase Information:
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127 (402) 592-4950. The hard copy sets of both projects are available PURCHASE ONLY. The cost for the bid documents on the Williams Science Hall Project is $320.00 (non-refundable) payable to A&D Technical Supply Co., Inc.
The cost for the bid documents on the Wittson Hall/Wigton Heritage Project is $620.00 (non-refundable) *A Builder's Card will NOT be accepted on this project.

CD's and Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $100.00 for Williams Science Hall and $150.00 for Wittson Hall/Wigton Heritage Center; each payable to A&D Technical Supply Co., Inc.
Only complete sets of Bid Documents may be obtained.

If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $200.00 payable to A&D Technical Supply Co., Inc.
If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.

Please do not return bid documents as they are purchase only and no refund will be issued.


Addenda
  • 11/29/2018 - Addendum #1 Addendum #1 was posted on 11-29-2018  Click to View
  • 12/03/2018 - Addendum #1 Wittson Addendum #1 for Wittson was posted on 12-3-2018  Click to View
  • 12/06/2018 - Addendum #2 Williams Addendum #2 was posted on 12-6-2018  Click to View
  • 12/07/2018 - Addendum #2 Wittson Addendum #2 for Wittson Hall was posted on 12-7-2018  Click to View
  • 12/11/2018 - Addendum #3 Wittson Addendum #3 for Wittson Hall was posted on 12-11-2018  Click to View